Applying BIM to legacy real estate

Aller vers le contenu

Challenge

Legacy real estate, whether dating back 10 years or three centuries, rarely benefits from the advantage of a digital BIM model. The lack of centralised verified information, ranging from architectural plans to equipment information, negatively affects the operating and maintaining legacy estates. Such facilities are more time-consuming, more expensive to operate and restrict owners from deploying cutting edge technology on the estate.

Innovative Solution

Our UK experts have developed a two-step solution to this challenge: our RetroBIM offering, recently launched via the Smart Melody platform.
First, an e-discovery process including data collection, laser measurements, digitalisation of paper documentation and more, centralises all building and equipment information within a digital library.
Secondly, our engineering team creates a RetroBIM model for the estate, which is then used for operating and maintaining the facility.

How It Works

The RetroBIM solution is particularly versatile, covering any type of legacy real estate, from heritage sites to warehousing units.

Client Benefits

Key Figures

Building characteristics :
Commercial Office and Warehouse: 3 Floors, 3000 square metres and specialist gas and electrical supplies
Average duration:


Total time to build a RetroBIM model from scratch : 12 to 14 weeks

Maturity Level

Level 1 : Proof of Concept or lab test
Level 2: Tested under real life conditions
Level 3: Commercial solution


Read more Projects